Due: February 15thGroundwater Remediation Design Using Activated CarbonWork as a team of two for this assignment. Click here to register your team . Deliverables : Spreadsheet with calculations, written design with explanations and drawings, presentation. This project will be presented during class on February 15th. The wood treatment facility described in the previous two homework assignments plans to treat the contaminated groundwater at a rate of 100 gal/min. Design a treatment facility for this flow using either multiple columns, or a single moving bed adsorber. The process must be designed for continuous operation. |
||